MAKITECHRF ENGINEERING Get a Quote

Home / Locations / Texas

Texas

ERRCS & Public Safety DAS Engineering in Houston

Houston’s published ERRCS design guideline is specific about engineering credentials: Texas PE design and special-inspector testing.

Makitech RF Engineering · Updated October 2026

City of Houston design guideline at a glance

Code basisHouston Building and Fire Codes (Sections 914 and 510), NFPA 1221, NFPA 72
Signal / quality−95 dBm RSSI or stronger; DAQ 3.0 or better
Coverage95% of occupied spaces, 99% of critical areas
SurvivabilityLevel 2 riser and feeder pathways; riser in a 2-hour rated assembly
Secondary power12-hour battery minimum (the guideline also references 24-hour runtime — confirm with the AHJ)
DesignTexas Professional Engineer; PE-sealed plans or deferred submittal
TestingTexas PE or FCC GROL holder registered with the City as an ERRC Special Inspector; results documented as heatmaps
ExemptionNo plan review or third-party inspection for buildings with no basement, three stories or fewer, and 50,000 sq ft or less (code compliance still required)

Source: City of Houston IT Design Guideline Spec 275319, v5.0 (7/15/2025).1 Confirm applicability to your project with the Houston Fire Marshal’s Office.

How we help in Houston

RF design packages built to the Houston guideline, coordinated with your Texas PE of record, plus remote commissioning and acceptance report support.

Frequently asked questions

Does Houston require a Texas PE for ERRCS design?

The City’s design guideline calls for a Texas Professional Engineer as designer and PE-sealed plans for review.

Are small buildings exempt in Houston?

Buildings with no basement, three stories or fewer, and 50,000 sq ft or less are exempt from plan review and third-party inspection, but must still comply with the code.

References

  1. City of Houston IT Design Guideline Spec 275319 — Emergency Responder Radio Communication System (v5.0, 7/15/2025). preflight.houstontx.gov

General information, not a substitute for your AHJ’s current requirements or a project-specific design. Local standards change; confirm with the fire code official.

Request a quote

Tell us about the building.

Fixed-price proposals within one business day. If a system isn’t needed, we’ll tell you.

Or email engineering@makitechrf.com