The statewide baseline: CFC Section 510
The 2025 CFC (based on the 2024 International Fire Code) requires an approved ERCES in all new buildings, with exceptions for small one-story buildings without below-grade areas and buildings the fire code official exempts. Existing buildings are covered by Chapter 11.1 Key statewide numbers:
- Coverage: 95% of all areas and 99% of critical areas on each floor.
- Audio quality: DAQ 3.0 minimum, inbound and outbound.
- Design standard: NFPA 1225; equipment listed to UL 2524.
- Secondary power: 12 hours at 100% capacity.
- Enclosures: NEMA 4 for signal boosters, NEMA 3R+ for batteries.
- Permits: a construction permit to install or modify the system.
- Licensee authorization: written approval from the frequency license holder before activation.
Source: CFC Section 510.1
Local amendments: where projects actually get held up
The CFC lets the fire code official designate critical areas and approve the system, and most departments publish their own ERRCS standard. Two recent examples show how much stricter local rules can be:
Burbank (effective September 1, 2025)
- Applies at 2+ levels above grade, any below-grade level, or 12,000 sq ft and up.
- −95 dBm minimum uplink and downlink, DAQ 3.4, BER ≤ 2%.
- 24-hour dedicated battery, or generator plus 12-hour battery.
- 2-hour minimum pathway survivability; plenum cable in EMT.
- GROL and NICET IB-PSC certifications for designers, installers, and testers; C-7 or C-10 contractor license.
- An annual Permit to Operate from the frequency licensee.
Source: Burbank ERRCS Regulations.2
San Diego (Standard C-1)
- Required in new high-rises; low-rises evaluated at 3+ stories, 20,000+ sq ft, or a basement over 2,500 sq ft.
- −95 dBm inbound with DAQ 3.4; downlink SINR ≥ 20 dB.
- Backbone fire rating tied to construction type (2-hour, 1-hour, or none for small sprinklered buildings).
- Acceptance testing by a third party unrelated to the installer; testers need GROL and NICET IB-PSC Level II.
- Annual testing plus semiannual visual inspections.
Source: San Diego Fire-Rescue Standard C-1.3
Los Angeles area
Requirements in the LA basin depend on which fire department has jurisdiction. The City of Los Angeles publishes Fire Prevention Requirement #105 for emergency responder radio coverage; LA County Fire, Culver City, Monterey Park, and other departments publish their own specifications.4 Plan review and acceptance go through that local AHJ, not the state.
Project checklist for California GCs
- Identify the AHJ and the frequency licensee early — they can be different agencies.
- Get the local ERRCS standard and note DAQ, dBm, battery hours, survivability, and tester qualifications.
- Run a feasibility assessment during design to budget for a system before bids are final.
- Coordinate pathways with the architect: riser space, rated enclosures, roof donor location.
- Request licensee authorization before activation, and schedule third-party acceptance testing ahead of the C of O.
Frequently asked questions
Which California Fire Code edition applies to ERRCS now?
The 2025 California Fire Code took effect January 1, 2026. Projects permitted under the 2022 code may still be reviewed under it, so confirm the code of record with your AHJ.
Does California require NFPA 1221 or NFPA 1225?
The 2025 CFC references NFPA 1225, which now contains the ERCES requirements that were previously in NFPA 1221.
Who approves an ERRCS in California?
The local fire code official approves the system, and the public safety frequency license holder must authorize it in writing before it’s activated.
References
- 2025 California Fire Code, Section 510. gocodebook.com
- City of Burbank Fire Department — ERRCS Regulations (effective Sept. 1, 2025). www.burbankca.gov
- San Diego Fire-Rescue Standard C-1 — Emergency Responder Communication Enhancement Systems. sandiego.gov
- LACCD A/E Bulletin 2021-001R1 — Emergency Responder Radio Coverage Systems (lists LA-area AHJ requirements). www.build-laccd.org
- NFPA 1225 — Standard for Emergency Services Communications. www.nfpa.org
General information, not a substitute for your AHJ’s current requirements or a project-specific design. Local standards change; confirm with the fire code official.